Public Environmental Review Document

Volume 1

Public Environmental Review Document (Part 1)

Public Environmental Review Document (Part 2)

Public Environmental Review Document (Part 3)

Volume 2

Management Plan Appendix

Appendix 1 - Artificial Wetland Management Plan

Appendix 2 - Construction Environmental Management Plan

Appendix 3 - Operational Environmental Management Plan

Appendix 4 - Port Operations Environmental Management Plan

Appendix 5 - Gouldian Finch Management Plan

Appendix 6 - Aboriginal Cultural Heritage Management Plan

Appendix 7 - Environmental Offsets Reporting

Volume 3

Document Appendix

Appendix 1 - Geology Cross Sections of Sorby Hills

Appendix 2 - Geotechnical Assessment Report

Appendix 3 - Soil Test Results Summary

Appendix 4 - Sorby Hills Pre-Mine Soils Characterisation

Appendix 5 - Sorby Hills Geochemical Characterisation

Appendix 6 - Sorby Hills Pit Design and Mine Production Schedule

Appendix 7 - Sorby Hills Hydrogeological Assessment

Appendix 8 - Relevant MSDS Forms

Appendix 9 - Infrastructure Design

Appendix 10 - Sorby Hills Surface Flow Analysis

Appendix 11 - Sorby Hills Dangerous Goods Classification (1)

Appendix 11 - Sorby Hills Dangerous Goods Classification (2)

Appendix 12 - Transport Logistics Method Statement - POAGS

Appendix 13 - Freight and Logisitics Services in East Kimberley Region

Appendix 14 - Accommodation correspondence with Department of Regional Development

Appendix 15 - Accommodation correspondence with Local Land Owner

Appendix 16 - Community Information Pamphlet

Appendix 17 - Community Information Advert in local newspaper, The Kimberley Echo

Appendix 18 - Stakeholder Consultation Register

Appendix 19 - Water Quality Results

Appendix 20 - Weaber Plain Hydrology

Appendix 21 - Weaber Plain Groundwater Chemistry

Appendix 22 - Sorby Hills Baseline Flora Project

Appendix 23 - Sorby Hills Conservation Significant Flora Survey

Appendix 24 - Sorby Hills Terrestrial Vertebrate Fauna Survey

Appendix 25 - Sorby Hills Ornithological Survey

Appendix 26 - Sorby Hills Bat Survey

Appendix 27 - Sorby Hills Subterranean Fauna Survey

Appendix 28 - Surface Water Quality Results

Appendix 29 - Pit Lake Water Balance and Water Quality Modelling

Appendix 30 - Aboriginal Heritage Desktop Analysis

Appendix 31 - Department of Indigenous Affairs Aboriginal Site Database Search

Appendix 32 - Sorby Hills Archeological Assessment

Appendix 33 - Sorby Hills Aboriginal Hertiage Site Survey

Appendix 34 - MG Corporation Heritage Clearance Letter

Appendix 35 - Wyndham Port Contaminated Site Status

Appendix 36 - Sediment Basin Memo

Appendix 37 - Tailings Storange Facility Overflow Risk Assessment (1)

Appendix 37 - Tailings Storange Facility Overflow Risk Assessment (2)

Appendix 37 - Tailings Storange Facility Overflow Risk Assessment (3)

Appendix 37 - Tailings Storange Facility Overflow Risk Assessment (4)

Appendix 38 - Baseline Dust Monitoring Results (1)

Appendix 38 - Baseline Dust Monitoring Results (2)

Appendix 38 - Baseline Dust Monitoring Results (3)

Appendix 38 - Baseline Dust Monitoring Results (4)

Appendix 38 - Baseline Dust Monitoring Results (5)

Appendix 38 - Baseline Dust Monitoring Results (6)

Appendix 38 - Baseline Dust Monitoring Results (7)

Appendix 38 - Baseline Dust Monitoring Results (8)

Appendix 38 - Baseline Dust Monitoring Results (9)

Appendix 38 - Baseline Dust Monitoring Results (10)

Appendix 39 - Sorby Hills Greenhouse Gas Assessment

Volume 4

Environmental Scoping Document (1)

Environmental Scoping Document (2)